SR 1 Bridge Over Southern Railroad Utility Relocation
Since 2010 Cannon & Cannon began working with Knoxville Utilities Board (KUB) for the design of the relocation of the existing electric facilities, in conjunction with the TDOT “Replacement of the SR-1 Bridge (Broadway Viaduct) over the Norfolk Southern Railroad at LM 19.47” project.
The complex project includes two new bridge designs (box and truss) over a railroad switchyard. Utilities to be relocated are both hanging on the bridge and underground at the base of the bridge and the approaches. The scope includes:
• Relocation of approximately 700 LF of overhead distribution lines
• Installation of approximately 700 LF of underground primary
• Design of lighting for new bridge
• Relocation of 4” PE gas line that was attached to the viaduct to underground
• Relocation of 8” and 12” water lines both underground and attached to the viaduct
• Sewer relocation at the approaches to the viaduct
Project is currently under construction.
LOCATION
Knoxville, TN
MARKETS
Transportation
Services
Engineering Design
Permitting
Civil Engineering
Field Surveying
Utilities and Infrastructure
Street Lighting
Site Utilities
Roadways & Intersections
Electric